REMOVAL AND INSTALLTION <4A9>



Pre-removal Operation
  • Engine Coolant Draining (Refer to GROUP 14, On-vehicle Service - Engine Coolant Replacement ).
  • Air Cleaner Assembly, Air Intake Duct Removal (Refer to ).
  • Throttle Body Removal (Refer to GROUP 13D, Throttle Body ).
  • Fuel Injector Removal (Refer to Group 13D, Injector ).

Post-installation Operation
  • Fuel Injector Installation (Refer to GROUP 13D, Injector ).
  • Throttle Body Installation (Refer to GROUP 13D, Throttle Body ).
  • Air Cleaner Assembly, Air Intake Duct Installation (Refer to ).
  • Engine Coolant Refilling (Refer to GROUP 14, On-vehicle Service - Engine Coolant Replacement ).





Removal steps


1.
Harness clamp connection


2.
Alternator connector


3.
Alternator terminal


4.
PCV hose connection


5.
Brake booster vacuum hose connection


6.
Purge hose connection


7.
Manifold absolute pressure sensor connector


8.
Manifold absolute pressure sensor


9.
O-ring


10.
Harness clamp connection


11.
Harness clamp connection

>>A<<
12.
Inlet manifold stay

>>A<<
13.
Inlet manifold


14.
Inlet manifold gasket

INSTALLATION SERVICE POINT



>>A<<INLET MANIFOLD/INLET MANIFOLD STAY INSTALLATION


1.Install the inlet manifold and Inlet manifold stay temporarily tighten the mounting bolts.
2.
caution Check that the sealing surfaces of the inlet manifold and inlet manifold stay contact securely after temporary tightening.
Tighten the inlet manifold and Inlet manifold stay bolts to the specified torque.
Tightening torque : 19 ± 1 N·m