REMOVAL AND INSTALLATION



Pre-removal Operation
  • Glove Box Removal (Refer to GROUP 52A - Glove Box ) <LH drive vehicles>.
  • Instrument Panel Cover Lower Removal (Refer to GROUP 52A - Instrument Lower Panel ) <RH drive vehicles>.
  • EPS-ECU Bracket Removal (Refer to GROUP 37 - EPS-ECU ) <RH drive vehicles>.

Post-installation Operation
  • Glove Box Installation (Refer to GROUP 52A - Glove Box ) <LH drive vehicles>.
  • EPS-ECU Bracket Installation (Refer to GROUP 37 - EPS-ECU ) <RH drive vehicles>.
  • Instrument Panel Cover Lower Installation (Refer to GROUP 52A - Instrument Lower Panel ) <RH drive vehicles>.





Removal steps


·
DC/DC converter connector


1.
AS&G-ECU


·
DC/DC converter (Refer to GROUP 54A - DC/DC Converter )


2.
Bracket