REMOVAL AND INSTALLATION <6B3>



Pre-removal Operation
  • Engine Room Under Cover Front A, B Removal (Refer to GROUP 51 - Under Cover ).

Post-installation Operation
  • Engine Room Under Cover Front A, B Installation (Refer to GROUP 51 - Under Cover ).





Removal steps


1.
Engine oil pressure switch connector


2.
Heat protector
<<A>>
>>A<<
3.
Engine oil pressure switch

REMOVAL SERVICE POINT



<<A>> ENGINE OIL PRESSURE SWITCH REMOVAL



Use special tool oil pressure switch wrench (MB992118) to remove the engine oil pressure switch.

INSTALLATION SERVICE POINT



>>A<< ENGINE OIL PRESSURE SWITCH INSTALLATION



1.Apply sealant to the engine oil pressure switch thread.
Specified sealant: 3M ATD Part No.8660 or equivalent

2.
caution Do not start the engine for 2 hour or more after the oil pressure switch installation.
In the same manner as removal, use special tool oil pressure switch wrench (MB992118) to tighten the engine oil pressure switch to the specified torque.
Tightening torque: 10 ± 2 N·m