REMOVAL AND INSTALLATION <6B3>



Pre-removal operation
  • Engine Coolant Draining <4B1, 6B3> (Refer to ).
  • Timing Belt Removal (Refer to GROUP 11C - Timing Belt ).

Post-installation operation
  • Timing Belt Installation (Refer to GROUP 11C - Timing Belt ).
  • Engine Coolant Refilling <4B1, 6B3> (Refer to ).





Removal steps


1.
Water pump


2.
Water pump gasket