REMOVAL AND INSTALLATION <4N1>



Pre-removal Operation
  • Engine Room Under Cover Front A and B Removal (Refer to GROUP 51 - Under Cover ).
  • Engine Coolant Draining (Refer to GROUP 14 - On-vehicle Service, Engine Coolant Replacement ).
  • Engine Oil Draining (Refer to ).

Post-installation Operation
  • Engine Oil Refilling (Refer to ).
  • Engine Coolant Refilling (Refer to GROUP 14 - On-vehicle Service, Engine Coolant Replacement ).
  • Engine Room Under Cover Front A and B Installation (Refer to GROUP 51 - Under Cover ).





Engine oil cooler removal steps


1.
Battery wiring harness


2.
Radiator piping feed hose connection


3.
Radiator piping return hose connection


4.
Engine oil cooler assembly


5.
O-ring


6.
Harness bracket



EGR cooler and engine oil cooler bracket removal steps


·
EGR valve assembly (Refer to GROUP 17 - Exhaust Gas Recirculation (EGR) Valve )


4.
Engine oil cooler assembly


5.
O-ring


7.
Harness bracket


·
Variable geometry control solenoid valve connector and EGR cooler solenoid valve connector (Refer to GROUP 15 - Inlet Manifold )


8.
Cooling water line hose C


9.
Cooling water line hose D


·
Starter assembly (Refer to GROUP 16 - Starting System, Starter Motor Assembly )


·
Engine oil level gauge (Refer to GROUP 16 - Charging System, Alternator Assembly )


·
Radiator upper hose connection (Refer to GROUP 14 - Radiator )


10.
EGR cooler and engine oil cooler bracket assembly


11.
O-ring


12.
EGR cooler


13.
Engine oil cooler bracket