REMOVAL AND INSTALLATION


For the service procedures other than described below, refer to GROUP 11A - Cylinder Head Gasket .
Pre-removal operation
Post-installation operation

  • Fuel Line Pressure Reduction (Refer to GROUP 13E - On-vehicle Service, How to Reduce Pressurized Fuel Lines ).
  • Engine Room Under Cover Front A, B and Engine Room Side Cover (RH) Removal (Refer to GROUP 51 - Under Cover ).
  • Engine Coolant Draining (Refer to GROUP 14A - On-vehicle Service, Engine Coolant Replacement ).
  • Air Cleaner Intake Hose and Air Cleaner Assembly Removal (Refer to GROUP 15 - Air Cleaner ).
  • Ignition Coil Removal (Refer to GROUP 16 - Ignition System, Ignition Coil ).
  • Exhaust Manifold Removal (Refer to GROUP 15 - Exhaust Manifold ).
  • Throttle Body Assembly Removal (Refer to GROUP 13E - Throttle Body Assembly ).
  • Thermostat Case Removal (Refer to GROUP 14A - Water Hose and Water Pipe ).


  • Thermostat Case Installation (Refer to GROUP 14A - Water Hose and Water Pipe ).
  • Throttle Body Assembly Installation (Refer to GROUP 13E - Throttle Body Assembly ).
  • Exhaust Manifold Installation (Refer to GROUP 15 - Exhaust Manifold ).
  • Ignition Coil Installation (Refer to GROUP 16 - Ignition System, Ignition Coil ).
  • Air Cleaner Intake Hose and Air Cleaner Assembly Installation (Refer to GROUP 15 - Air Cleaner ).
  • Engine Coolant Refilling (Refer to GROUP 14A - On-vehicle Service, Engine Coolant Replacement ).
  • Engine Room Under Cover Front A, B and Engine Room Side Cover (RH) Installation (Refer to GROUP 51 - Under Cover ).
  • Fuel Leak Check.