REMOVAL AND INSTALLATION



danger
  • When servicing the high-voltage system parts, be sure to wear the specified protection equipment and disconnect the service plug to interrupt the high-voltage supply (Refer to ).
  • Do not disassemble any on board EV charger cable (quick charging) other than those described in this manual.
Pre-removal Operation
  • Rear scuff plate removal(Refer to GROUP 52A - Interior trim )
  • Cargo floor box, quarter trim lower and quarter trim upper removal(Refer to GROUP 52A - Interior trim )
  • Second seat assembly removal (Refer to GROUP 52A - Second seat assembly )
  • EV motor control unit cover and EV control unit cover Removal (Refer to )
  • Work hole lid removal (Refer to )

Post-installation Operation
  • Work hole lid Installation (Refer to )
  • EV motor control unit cover and EV control unit cover Installation (Refer to )
  • Second seat assembly installation(Refer to GROUP 52A - Second seat assembly )
  • Cargo floor box, quarter trim lower and quarter trim upper Installation (Refer to GROUP 52A - Interior trim )
  • Rear scuff plate Installation (Refer to GROUP 52A - Interior trim )





Removal steps


1.
Earth bolt


2.
Cable bracket

>>A<<
3.
O ring
<<A>>
>>A<<
4.
EV charger cable (quick charging P, N line)

REMOVAL SERVICE POINTS



<<A>> EV CHARGER CABLE (QUICK CHARGING P, N LINE) REMOVAL (DRIVE BATTERY ASSEMBLY SIDE)



1.Remove the inner cable mounting bolts (2 locations).
2.Remove the outer cable mounting bolts (2 locations).
3.Pull out the EV charger cable(quick charging P, N line) from the drive battery assembly.

INSTALLATION SERVICE POINTS



>>A<< O RING INSTALLATION / EV CHARGER CABLE (QUICK CHARGING P, N LINE) CONNECTIONE


caution
  • Make sure that the EV charger cable and the O ring are free of foreign material.
  • Engage the cable as shown, keeping it straight.


1.Insert the rear cable (P and N wires) into the drive battery assembly.
2.Connect the EV charger cable (P and N wires for quick charging) to the drive battery.
3.Install the outer cable mounting bolts and inner cable mounting bolts in this order and tighten them to the specified torque.
Tightening torque: 7.0 ± 2.0 N·m