REMOVAL AND INSTALLATION



Pre-removal and Post-installation Operation
  • Power Steering Fluid Draining and Refilling (Refer to ) and Bleeding (Refer to ).






Removal steps


1.
Cap


2.
Oil reservoir


3.
O-ring

>>E<<
4.
Return hose

>>D<<
5.
Suction hose


6.
Eye bolt


7.
Gasket

>>C<<
8.
Pressure hose assembly

>>A<<
9.
Pressure tube assembly


10.
O-ring


11.
Return tube assembly

>>B<<
12.
Return hose

>>A<<
13.
Return tube assembly


14.
O-ring

INSTALLATION SERVICE POINTS



>>A<< RETURN TUBE ASSEMBLY/PRESSURE TUBE ASSEMBLY INSTALLATION



Align the mating marks on the gear box, return tube assembly and pressure tube assembly when installing.

>>B<< RETURN HOSE INSTALLATION





1.Install the return hose and return tube assembly so that the mating marks and facing forward <Except 2WD (High rider), 4WD-RHD>, or upward <2WD (High rider), 4WD-RHD>.



2.Install so that the mating marks are faced forward.

>>C<< PRESSURE HOSE ASSEMBLY INSTALLATION



1.Install so that the mating marks are facing rearward.

2.Place the pressure hose stopper to touch the power steering oil pump stopper, and install the pressure hose assembly.

>>D<< SUCTION HOSE INSTALLATION



Install so that the markings are faced upward.

>>E<< RETURN HOSE INSTALLATION



Install the return hose so that the markings and lines are faced rearward.