REMOVAL AND INSTALLATION







Removal steps


1.
Oil level gauge rod


2.
O-ring

>>G<<
3.
Injector protector rear

>>G<<
4.
Bracket

>>G<<
5.
Bracket

>>G<<
6.
Delivery pipe assembly

>>F<<
7.
Injection support


8.
O-ring

>>F<<
9.
Injector

>>E<<
10.
O-ring


11.
Delivery pipe

>>D<<
12.
Inlet manifold stay


13.
Injector protector front

>>C<<
14.
Inlet manifold


15.
Inlet manifold gasket


16.
Oil level gauge guide


17.
O-ring

>>B<<
18.
Alternator bracket


19.
Detonation sensor

>>A<<
20.
Oil pressure switch

INSTALLATION SERVICE POINTS



>>A<< OIL PRESSURE SWITCH INSTALLATION



caution
  • Do not allow sealant to squeeze out to the screw tip.
  • Do not tighten, exceeding the specified torque.
1.Completely remove sealant adhering to the oil pressure switch and cylinder block threaded holes.
2.Apply sealant of 5 mm to the threaded portion of the oil pressure switch shown in the illustration.
Specified sealant:
    Three bond 1215, Three bond 1212D or equivalent
3.Tighten the oil pressure switch to the cylinder block to the specified torque of 10 ± 2 N·m.

>>B<< ALTERNATOR BRACKET INSTALLATION



Tighten the Alternator bracket to the specified torque of 44 ± 8 N·m.
note Be careful to install mounting bolts because they are different in length.

>>C<< INLET MANIFOLD INSTALLATION


caution Temporarily tighten the inlet manifold because there is a bolt tightening procedure for the inlet manifold, delivery pipe and injector protector.
Install the inlet manifold and temporarily tighten bolts.

>>D<< INLET MANIFOLD STAY INSTALLATION



Make sure that the inlet manifold stay is in intimate contact with the inlet manifold and cylinder block boss before tightening it to the specified torque of 20 ± 2 N·m.

>>E<< O-RING INSTALLATION



When inserting an O-ring into the injector on the injection nozzle side, use special tool O-ring installer (MB992106) to gradually expand the O-ring, and fit it in place.

>>F<< INJECTOR AND INJECTOR SUPPORT INSTALLATION


1.Apply gasoline to the O-ring of the injector.
2.Insert the injector into the delivery pipe while rotating the injector from side to side, taking care not to damage the O-ring.
3.Check that the injector rotates smoothly. If it does not rotate smoothly, the O-ring may be caught. Remove the injector and check the O-ring for damage. Then, insert it again into the delivery pipe and check.

4.Make sure that the protrusion of the injector is at the center as shown in the illustration.

5.Securely assemble the injector to the injector groove and delivery pipe collar.

>>G<< DELIVERY PIPE ASSEMBLY / BRACKET / INJECTOR PROTECTOR REAR INSTALLATION



1.Install the delivery pipe assembly, bracket and injector protector on the cylinder head.
2.Tighten mounting bolts together with temporarily tightened inlet manifold mounting bolts in the order shown in the illustration.
3.Tighten the delivery pipe assembly, bracket, injector protector rear and inlet manifold in the order shown in the illustration.

    Temporarily torque: 3.5 ± 1.5 N·m
    Specified torque: 20 ± 2 N·m