SUPERCHARGING PRESSURE CONTROL SYSTEM CHECK
![]() |
1.Disconnect the hose (black) from the waste gate solenoid valve and connect a three-way
joint between the hose and the solenoid valve. 2.Connect a hand pump (pressurized type) to the three-way joint. |
![]() |
1.Disconnect the hose (black) from the waste gate solenoid valve and connect a three-way
joint between the hose and the solenoid valve. 2.Connect a hand pump (pressurized type) to the three-way joint. |