Pre-removal operation
- Engine Room Under Cover Front A, C and Engine Room Side Cover Removal (Refer to GROUP 51 - Under Cover
).
- Engine Coolant Draining (Refer to GROUP 14 - On-vehicle Service, Engine Coolant Replacement <4HN>
).
- Air Cleaner Intake Duct Removal <4HN> (Refer to
).
- Battery and Battery Tray Removal (Refer to GROUP 54A - Battery
).
- Front Bumper Assembly Removal (Refer to GROUP 51 - Front Bumper Assembly
).
|
Post-installation operation
- Front Bumper Assembly Installation (Refer to GROUP 51 - Front Bumper Assembly
).
- Battery and Battery Tray Installation (Refer to GROUP 54A - Battery
).
- Air Cleaner Intake Duct Installation <4HN> (Refer to
).
- Engine Coolant Refilling (Refer to GROUP 14 - On-vehicle Service, Engine Coolant Replacement <4HN>
).
- Engine Room Under Cover Front A, C and Engine Room Side Cover Installation (Refer to GROUP 51 - Under Cover
).
|