REMOVAL AND INSTALLATION <6B3>



Pre-removal Operation
  • Engine Coolant Draining (Refer to GROUP 14 - On-vehicle Service, Engine Coolant Change <4B1, 6B3> ).
  • Battery and Battery Tray Removal (Refer to GROUP 54A - Battery ).

Post-installation Operation
  • Battery and Battery Tray Installation (Refer to GROUP 54A - Battery ).
  • Engine Coolant Refilling (Refer to GROUP 14 - On-vehicle Service, Engine Coolant Change <4B1, 6B3> ).





Removal steps
<<A>>
>>A<<
1.
Radiator upper hose connection


2.
Harness bracket


3.
Camshaft position sensor connector


4.
Camshaft position sensor


5.
O-ring

REMOVAL SERVICE POINT



<<A>> RADIATOR UPPER HOSE DISCONNECTION



Make mating marks on the radiator upper hose and the hose clamp. Disconnect the radiator upper hose.

INSTALLATION SERVICE POINTS



>>A<< RADIATOR UPPER HOSE INSTALLATION



1.Insert radiator upper hose as far as the projection of the thermostat housing.
2.Align the mating marks on the radiator upper hose and hose clamp, and then connect the radiator upper hose.