FRONT PILLAR <CLUB CAB, DOUBLE CAB>







note Refer to the Fender Shield Section on for the welding point with front fender shield upper reinforcement rear.



NOTE ON REPAIR WORK



REMOVAL



When removing the front pillar, since the side outer panel interferes with the cowl top panel inner, cut and turn up the side outer panel as shown in the figure.

INSTALLATION



1.To reinforce the strength of the front pillar cut area, cut the side outer panel 100 mm above the cut-out part and front pillar upper reinforcement 50 mm above the cut-out part.

2.To reinforce the strength of the side sill cut area, cut the side outer panel 100 mm behind the cut-out part and the floor side sill outer reinforcement front 50 mm behind the cut-out part.
3.Install the new front inner pillar lower parts.

4.Cut the new front pillar inner upper part by aligning it with the body-side and install it.

5.Cut the new front pillar reinforcement upper part by aligning it with the body-side and install it.

6.
caution Weld and repair if the side sill reinforcement bulkhead front is damaged.
Cut the new floor side sill outer reinforcement parts by aligning them with the cut area of floor side sill outer reinforcement front in the body-side. Then, cut only the floor side sill outer reinforcement front 100 mm forwards from the cut area to create a cover, and then cut the side sill reinforcement bulkhead front 50 mm forwards from the cut area.


7.
caution To improve accuracy of assembling the new front pillar reinforcement lower parts and new floor side sill outer reinforcement parts, temporarily assemble them on the body, align with the body, and then temporarily weld and assemble the new parts. After assembling, remove it from the body.
Tighten the temporarily-welded front pillar reinforcement lower parts and floor side sill outer reinforcement parts with flange bolts.
Flange bolts tightening torque: 24 ± 4 N·m

8.When installing the assembled front pillar reinforcement lower and floor side sill outer reinforcement, apply adhesive and body sealant on the body as shown in the figure. To the side sill, weld the side sill reinforcement bulkhead front, and then weld the cover of floor side sill outer reinforcement front.
Adhesive: Epoxyayresin adhesive
Brand: 3M ATD Part No.8115 or equivalent