REMOVAL AND INSTALLATION <4A9>



Pre-removal Operation
  • Engine Coolant Draining (Refer to ).
  • Engine Room Side Cover (RH) Removal (Refer to GROUP 51 - Under Cover ).
  • Alternator and Others Belt Removal (Refer to GROUP 11A - Crankshaft Pulley ).

Post installation Operation
  • Alternator and Others Belt Installation (Refer to GROUP 11A - Crankshaft Pulley ).
  • Alternator and Others Belt Tension Check and Adjustment (Refer to GROUP 11A - On-vehicle Service, Drive Belt Tension Check and Adjustment ).
  • Engine Coolant Refilling (Refer to ).
  • Engine Room Side Cover (RH) Installation (Refer to GROUP 51 - Under Cover ).





Removal steps


1.
Water pump pulley


2.
Water pump


3.
O-ring