REMOVAL AND INSTALLATION



Pre-removal Operation
  • Engine Room Under Cover Front A, B and Engine Room Side Cover Removal (Refer to GROUP 51 - Under Cover ).
  • Front Exhaust Pipe Removal (Refer to GROUP 15 - Exhaust Pipe and Main Muffler <BWC> ).
  • Intercooler Air Pipe D and Intercooler Air Pipe Bracket Removal (Refer to GROUP 15 - Intercooler ).

Post-installation Operation
  • Intercooler Air Pipe D and Intercooler Air Pipe Bracket Installation (Refer to GROUP 15 - Intercooler ).
  • Front Exhaust Pipe Installation (Refer to GROUP 15 - Exhaust Pipe and Main Muffler <BWC> ).
  • Engine Room Under Cover Front A, B and Engine Room Side Cover Installation (Refer to GROUP 51 - Under Cover ).





Removal steps


1.
DPF bracket


2.
Clamp


3.
Catalytic converter assembly


4.
Seal ring