REMOVAL AND INSTALLATION



<Except Euro5b>


Pre-removal Operation
  • Under Skid Plate and Engine Room Under Cover Removal (Refer to GROUP 51 - Under Cover ).
  • Battery and Battery Box Removal (Refer to 54A - Battery ) <Vehicles with Sub Battery>.

Post-installation Operation
  • Battery and Battery Box Installation (Refer to 54A - Battery ) <Vehicles with Sub Battery>.
  • Under Skid Plate and Engine Room Under Cover Installation (Refer to GROUP 51 - Under Cover ).





Removal steps


1.
Front exhaust pipe connection


2.
Exhaust pipe gasket


3.
Catalytic converter protector


4.
Catalytic converter


5.
Catalytic converter gasket

<Euro5b>


caution
  • When the catalytic converter is replaced, use the M.U.T.-III to initialise the learning value (Refer to GROUP 00 - Precautions before Service, Initialisation Procedure for Learning Value in DPF System ).
  • When the catalytic converter is replaced, perform the forcible DPF regeneration after learning value in DPF system (Refer to ).
Pre-removal Operation
  • Under Skid Plate and Engine Room Under Cover Removal (Refer to GROUP 51 - Under Cover ).
  • Battery and Battery Box Removal (Refer to 54A - Battery ) <Vehicles with Sub Battery>.
  • No.1 Exhaust Gas Temperature Sensor Removal (Refer to GROUP 17 - Emission Control, DPF System Sensors ).

Post-installation Operation
  • No.1 Exhaust Gas Temperature Sensor Installation (Refer to GROUP 17 - Emission Control, DPF System Sensors ).
  • Battery and Battery Box Installation (Refer to 54A - Battery ) <Vehicles with Sub Battery>.
  • Under Skid Plate and Engine Room Under Cover Installation (Refer to GROUP 51 - Under Cover ).





Removal steps


1.
Front exhaust pipe connection


2.
Exhaust pipe gasket


3.
Catalytic converter protector


4.
Catalytic converter


5.
Catalytic converter gasket